API 1169 welding questions test API 1104 (or CSA Z662) from the inspector's side of the line: is the procedure qualified, is the welder qualified for this joint, does the production weld follow the procedure, how many welds get nondestructive testing, and what happens to a defect. Welding is the heaviest block of installation construction, the category we estimate at 25–36% of the exam (API publishes no weights), which also covers stringing, field bending, cover, coating, crossings, lowering-in and tie-ins.

Built on the API 1169 Body of Knowledge and effectivity sheet API publishes · checked October 2026

Scope

What category 3 covers, in construction order

API's Body of Knowledge lists five main categories: inspection and management knowledge areas, front-end construction, installation construction, back-end construction and post-construction; at least one question comes from each, and API publishes no weights. Installation construction is the third of them and, by our estimate, the second heaviest at 25–36% of the exam. Treat that range as a study split, not API's weighting.

  • 1. Inspection & management35–45%
  • 2. Front-end construction8–12%
  • 3. Installation construction25–36%
  • 4. Back-end construction15–22%
  • 5. Post-construction3–10%
Estimated share of the exam, not API's weighting: API publishes no category weights. Track runs 0–50%; the tick is the midpoint.

The category follows the spread as it moves down the right-of-way, and the questions follow the same order RP 1169 uses for its activity chapters:

  1. Stringing and pipe handling
  2. Field bending
  3. Ditching and depth of cover
  4. Welding and NDE
  5. Field joint coating and holiday detection
  6. Lowering-in
  7. Bores, HDD and road or rail crossings
  8. Tie-ins

The documents behind it are closed book. The effectivity sheet lists API RP 1169 (2nd ed., 2020), API RP 1110 (7th ed., 2022, appendices excluded), API Spec Q1 (10th ed., Sections 3 to 5), CGA Best Practices, INGAA CS-S-9 Pressure Testing Safety Guidelines (2018), and either API Std 1104 (22nd ed., Sections 3 to 11) or CSA Z662:23 (listed chapters), per API as of October 2026; check the current list on API 1169 effectivity sheet (PDF). For welding that means API 1104 or the joining chapter of CSA Z662 has to be in your head. The regulations are a different matter. API's rule: the exam is closed book (no personal notes or books), with the listed parts of 49 CFR 192 and 195, 29 CFR 1910 and 1926, 50 CFR 21 Subpart B and the FERC Wetland and Waterbody Procedures (May 2013), or the Canadian equivalents, shown as on-screen PDFs without Ctrl+F search; a calculator and scratch paper are provided. API 1104 is not one of those PDFs, so the federal welding, bending and cover rules are the part of this category you can look up, and the API 1104 part is the one you cannot.

Welding: procedure, welder, production weld

Two qualifications, never one

API 1104 qualifies two things separately. The welding procedure is qualified once, by welding and destructively testing a test joint, and is then written up as the instructions the crew works to. The welder is qualified separately, by making a test weld under that procedure. A qualified procedure does not qualify the person holding the stinger, and a qualified welder cannot rescue a procedure that was never tested. When a stem describes a change on the line, the first sort is: does it break the procedure or the welder?

A procedure stays valid only while its essential variables stay inside what was qualified; change one and the procedure has to be requalified. A welder's qualification also covers a limited range of joints, so moving the same person to a different job can mean a new test even when the procedure has not changed. The exam likes to offer four changes and ask which one forces requalification: three will be adjustments the procedure already allows, one will cross a line the procedure section draws.

Recency: the gas and liquid rules are not the same sentence

Under 49 CFR 192.229 a gas welder must have welded with the process within the preceding six calendar months, and on higher-stress pipe the rule adds a tested weld, with an alternative of two tests a year no more than 7½ months apart. Under 49 CFR 195.222 a liquid welder needs both in the preceding six calendar months: welding with the process and one weld tested and found acceptable. Options that differ only by "and had one weld tested" are testing exactly this split.

What you watch at the line

  1. Before the arc

    The procedure and the welder's qualification are on file for this joint; pipe ends are inspected, bevels are clean and undamaged, and the fit-up matches the procedure. Heat numbers and joint numbers match the pipe tally.

  2. Preheat and weather

    Preheat, if the procedure calls for it, is checked with the method the spec names, and the weather is checked before the arc is struck. What the code says about wind and rain is one of the drill questions below.

  3. Root and hot pass

    Line-up clamp removal and the time between passes follow the procedure. Lifting or lowering the joint before the root is far enough along is a classic crack starter.

  4. Fill, cap and visual

    Each weld is cleaned between passes, finished, marked with its weld number and the welder's identification, and visually inspected before it goes to NDT.

  5. NDT and the weld map

    The weld goes on the weld map and the NDT log. Results come back accepted, repair, or cut out, and each outcome is recorded against the weld number.

Weld

NDE

NDE: how much gets tested, what gets cut out

Nondestructive testing of a girth weld is usually radiography or ultrasonic testing, and the question you will meet most is how much of it the rules require. The gas and liquid answers are built differently, which is why they make such good distractors for each other.

How much girth-weld NDT the federal rules ask for
QuestionGas: 49 CFR 192.243Liquid: 49 CFR 195.234
What sets the shareClass location of the lineEach welder's output for the day
Ordinary line pipeClass 1: at least 10%; Class 2: at least 15%At least 10% of each welder's girth welds that day, picked at random
Full-circumference locationsClass 3 and 4, major or navigable river crossings, offshore, railroad and public highway rights-of-way (at least 90% where 100% is impracticable)Listed sensitive locations such as populated areas, water-pollution risk, road and rail rights-of-way (at least 90% where 100% is impracticable)
Tie-ins100%100%
Who reads the film or scanPersonnel trained and qualified in the NDT procedurePersonnel trained and qualified in the NDT procedure

One nuance catches people who learned the gas rule as "class numbers only": when gas NDT is required, a sample of each welder's work for each day still has to be tested. The class sets the percentage; the per-welder sample makes sure nobody's welds escape it. The liquid rule simply starts from the welder.

Defects: know the categories, not the table

API 1104's acceptance section works by defect type, and the exam expects you to know what each name means: inadequate penetration with and without high-low, incomplete fusion, burn-through, slag, porosity, undercut and cracks. Each type has its own length or depth limits, in a single indication and accumulated over a stretch of weld. Learn which limits exist and how they are measured from the standard itself; this page will not reproduce its tables, and you should be wary of any study sheet that does without saying which edition it copied.

Cracks have their own federal rule. Under 49 CFR 192.245 and 49 CFR 195.230 a weld with a crack longer than 8% of the weld length is removed, not repaired. Other defects can be repaired under a qualified repair procedure, and the repaired weld is inspected again. Only people qualified in the NDT procedure interpret results; under API 1104 that means Level II or III technicians. A Level I who "has seen a lot of film" is a distractor.

Stringing and pipe handling

Stringing questions are about protecting pipe you cannot easily replace and recording what went where. Each joint is laid on padded skids or sandbags, kept off rock, with skips left at roads, driveways and crossings so traffic and livestock can pass. End caps stay on to keep dirt and water out of the bore and protect the bevels. Pipe is handled with end hooks, vacuum lifters or wide slings that do not damage coating; brass-lined hooks are out, because transferred brass can cause cracking when the bevel is later welded.

The pipe tally is the record that carries traceability: joint number, heat number, grade, wall thickness, length and coating, checked against the stencil and the mill test report. Every length is visually inspected at the site under 49 CFR 192.307 or 49 CFR 195.206. Unmarked pipe, or pipe whose stencil does not match the paperwork, is set aside until the question is resolved.

Damage has a hard rule. On higher-stress gas pipe, 49 CFR 192.309 requires removal of a dent deeper than ¼ in on pipe of 12¾ in OD or smaller, or deeper than 2% of the diameter on larger pipe, and of any dent that contains a gouge or sits on a weld. Removal means cutting out a cylinder of pipe. Pounding a dent back out or patching over it is not allowed.

String

Bend

Field bending

Cold field bends are made by the bending crew to the engineer's bend list; the inspector checks each bend against that list and against the bending rules. Almost every bending question is one of the four rows below.

Field bending: where gas and liquid agree and where they part
RuleGas (192)Liquid (195)
Wrinkle bendsNot allowed on pipe at 30% of SMYS or more (192.315)Prohibited (195.212)
ContourSmooth, no buckling, cracks or other mechanical damage; serviceability not impaired (192.313)Same requirement
Longitudinal seamAs near the neutral axis as practicableSame requirement
Seam exemptionInternal mandrel used, pipe 12 in OD or less, or D/t below 70Internal mandrel used, pipe 12¾ in OD or less, or D/t below 70

The mandrel is the other recurring item. An internal bending mandrel supports the pipe wall from inside during the bend so the pipe resists wrinkling and going oval. It is not a gauge, and it is not run after lowering-in to check roundness; options that treat it as a measuring tool are mixing it up with a gauging plate on a pig.

Watch for invented precision here. Bend angles, tangent lengths and ovality limits come from the owner company's specification and the bend list. An option that quotes a single universal ovality percentage for every cold bend has no reference behind it.

Ditch, depth of cover and clearance

Cover questions are lookups from the on-screen regulations, and the trap is almost never the normal-soil number. Read across the table: the two codes agree on ordinary rural ground and split on rock, which is where the options are built.

Minimum depth of cover, gas vs liquid
LocationGas, 192.327 (normal / rock)Liquid, 195.248 (normal / rock)
Rural, ordinary groundClass 1: 30 in / 18 inAny other area: 30 in / 18 in
Built-up areasClass 2, 3 and 4: 36 in / 24 inIndustrial, commercial, residential: 36 in / 30 in
Road and railroad drainage ditches36 in / 24 in36 in / 36 in
Water crossingsNavigable rivers, streams, harbors: 48 in / 24 inIts own row in 195.248: one of the drill questions below asks it

Two more numbers travel with cover. Pipe needs at least 12 in of clearance from any other underground structure (192.325, 195.250), with a smaller minimum for drain tile on liquid lines; where 12 in cannot be had, the pipe is protected instead. And under 195.210 a liquid line within 50 ft of a dwelling, industrial building or place of public assembly needs 12 in of extra cover.

Ditching is also an excavation, so the OSHA rules for protective systems, egress and the competent person's daily inspection apply in this category too. Those questions are worded "according to OSHA", and they are covered on the safety, quality and environmental page.

Cover

Coat

Coating and holiday detection

The federal anchor is one sentence: under 192.461 and 195.561, the external coating is inspected just before the pipe is lowered into the ditch and backfilled, and damage found is repaired. Everything else in this block hangs off that timing.

Coating checks in the order the spread meets them
CheckWhenWhat fails it
Surface preparationBefore field joint coatingBlast profile, cleanliness or steel temperature outside the coating spec
ApplicationDuring coatingThickness, cure or overlap onto mill coating not per spec
Detector set-upBefore each jeeping runVoltage not the one the spec sets for this coating and thickness; no current calibration
Holiday test (jeeping)Just before lowering-in and backfillAny holiday found and not repaired and re-tested
Protection in the ditchLowering-in and backfillRock, skids or supports in contact with coating; no padding or rock shield where specified

A holiday detector (the jeep) runs an electrode over the coating at a test voltage and sparks where the coating has a gap. The voltage comes from the coating specification for the coating type and thickness; too low misses holidays, too high can damage good coating. The inspector checks the detector's calibration and setting before the run, watches the run itself, and sees each holiday marked, repaired and jeeped again.

Crossings and HDD, lowering-in, tie-ins

Bores, HDD and road or rail crossings

Crossings are governed first by the crossing permit and the drawings: cased or uncased, wall thickness, depth below the road or rail, and any conditions the road or railroad owner set. On a cased crossing, the casing insulators, end seals and vents go in per drawing, and the carrier pipe must not touch the casing. For bored and drilled installations 192.461 also asks for precautions to limit coating damage, which is why pull sections usually carry an abrasion-resistant overcoat.

On a horizontal directional drill the inspector follows the pilot hole against the planned profile, watches drilling fluid returns and containment, and reports any inadvertent return the way the permit and the project's contingency plan require. The pull section is welded, tested and coated before pullback; after pullback, the exposed end is checked for coating damage.

Lowering-in

Before the pipe moves, the ditch is checked for depth, rock, debris and water, and padding is in place where the spec calls for it. During the lift, sidebooms are spaced and counted per the lift plan, the pipe rides in slings or cradles that do not cut coating, nobody stands under the load, and the string is lowered, not dropped, so it rests on the ditch bottom without being forced into place.

Tie-ins

Tie-ins join sections that were built apart, so they arrive with stress, gaps and cut pieces. The joint is aligned without forcing; cut-offs and new pups are recorded with their heat numbers on the tally; the weld is made to a qualified procedure and gets 100% NDT under both codes. A tie-in bell hole is an excavation, so the same protective-system questions apply.

When two options differ only by 192 or 195, the question is asking what is in the pipe. Find gas or liquid in the stem and half the options are gone.

Spreadcheck method

Install

Traps

Where the answers split

Most wrong answers in this category are real facts misplaced: a gas rule on a liquid line, or a check made at the wrong moment. Here are the splits that build them, with the one fact that breaks each pair.

Seven splits worth drilling
TopicHow the distractor is builtThe breaking fact
NDT shareClass-location percentages offered for a liquid lineLiquid starts from each welder's daily welds
Wrinkle bends"Acceptable within limits" on a liquid lineLiquid prohibits them outright
Seam exemption12 in and 12¾ in side by side12 in is gas, 12¾ in is liquid
Rock cover, road ditch24 in and 36 in side by side24 in is gas, 36 in is liquid
Coating inspectionYard check or after backfillJust before lowering-in and backfill
Damaged jointReuse it where stress is lowerMark it, keep it out, report it
Cracked weldRepair it like any other defectOver 8% of weld length means cut out

The practice pattern for all seven is the same: read the options, see the pair that differs by one word or one number, and go looking for that word in the stem.

Twelve installation questions

The set below leans the way the category does: nine on welding and NDE, two on trench and excavation safety, one on cover. Strike the options that cannot hold before you pick, and read the note on every option afterwards, the wrong ones included.

0 of 12 answered · 0 right

  • Cat 30/0

Press × to strike an answer you have ruled out, then pick from what is left. Keys: A–D or 1–4 pick, Shift+1–4 strikes. The verdict, the reasoning and a note on every option open in place.

Category 3 · Installation construction12 questions

  1. Q 01Cat 3 · Installation construction

    When a welding procedure is qualified, which document records the variables actually used and the test results that proved it?

  2. Q 02Cat 3 · Installation construction

    At girth-weld fit-up, the inspector checks the bevel angle, root face and root opening. Where are the required values specified?

  3. Q 03Cat 3 · Installation construction

    Which change during production welding is an essential variable that requires a requalified API 1104 welding procedure?

  4. Q 04Cat 3 · Installation construction

    Under API 1104 §9, an individual indication of inadequate penetration due to high-low (IPD) is unacceptable when longer than:

  5. Q 05Cat 3 · Installation construction

    Rain starts during a mainline weld and the crew has no welding shelter. According to 49 CFR 192, what applies?

  6. Q 06Cat 3 · Installation construction

    Under 49 CFR 192, a girth weld located where bending causes permanent deformation of the pipe must be:

  7. Q 07Cat 3 · Installation construction

    According to 49 CFR 192, an arc burn must be repaired or removed from steel pipe that will operate at a hoop stress of at least what share of SMYS?

  8. Q 08Cat 3 · Installation construction

    Under 49 CFR 192, welds visually approved by a qualified welding inspector need not be NDT tested when the pipe diameter is less than:

  9. Q 09Cat 3 · Installation construction

    According to OSHA Appendix B, what is the maximum slope for a simple-slope excavation in Type A soil that is 10 ft deep and open 24 hours or less?

  10. Q 10Cat 3 · Installation construction

    The crew wants to use a trench box deeper than the manufacturer's tabulated data allows, saying the box is 'overbuilt'. According to OSHA, this deviation is allowed only with:

  11. Q 11Cat 3 · Installation construction

    According to 49 CFR 195, what minimum cover (normal excavation) applies under an inland body of water at least 100 ft wide?

  12. Q 12Cat 3 · Installation construction

    A welder holds an API 1104 single qualification made on 8-in pipe and is now assigned to 24-in mainline. What does this require?

For all five categories in one mixed set, open the full practice test.

Drill

Wrap

Before you leave this station

Before you move on

  • Sort every welding stem first: procedure problem or welder problem.
  • Gas NDT is set by class location; liquid NDT by each welder's daily welds; tie-ins are 100% under both.
  • A crack over 8% of the weld length is cut out, not repaired.
  • Dents are cut out as a cylinder; damaged pipe is never reused somewhere easier.
  • Liquid lines take no wrinkle bends; the seam exemption is 12 in for gas, 12¾ in for liquid.
  • Coating is jeeped and repaired just before lowering-in and backfill.

Next: the study guide for how the five categories fit together, the inspection and management guide for category 1, or back to the Spreadcheck home page.

Questions people ask

What sections of API 1104 are on the API 1169 exam?

Sections 3 to 11 of API Std 1104 (22nd ed.), or the listed CSA Z662:23 chapters if you study the Canadian standard, per the current effectivity sheet, checked October 2026. Those sections run from definitions and procedure and welder qualification through production-weld inspection, acceptance standards for NDT, repair and removal of defects, and NDT procedures. API 1104 is closed book. Check API 1169 effectivity sheet (PDF) before you sit the exam.

Is CSA Z662 accepted instead of API 1104?

Yes. The effectivity sheet lists API 1104 or CSA Z662 as alternatives, and you may work from US or Canadian references; questions target the content the two overlap on, and items marked 'according to OSHA' are answerable only from 29 CFR 1910/1926. A Canadian candidate can study welding from Z662's joining chapter and expect questions written on what the two documents share.

How much of each day's welds must be radiographed?

The federal rules say nondestructively tested, which can be radiography or ultrasonic testing. For liquid lines, at least 10% of each welder's girth welds each day, picked at random, with 100% at listed sensitive locations. For gas lines, the share depends on class location: at least 10% in Class 1, 15% in Class 2, and 100% in Class 3 and 4 and at major crossings. Tie-ins get 100% under both.

When must coating be inspected before lowering-in?

Just before the pipe is lowered into the ditch and backfilled, under 49 CFR 192.461 for gas and 195.561 for liquid. Any damage found is repaired and holiday-tested again before the pipe goes in.

Do I need AWS CWI to take API 1169?

No. API 1169 has no welding-inspector prerequisite. A welding certification can help eligibility instead: AWS, CWB, AMPP CIP, API, ASNT Level II or higher, and CGSB/PCN/ISO 9712 certifications count toward the industry categories. It does not replace the API 1104 inspector knowledge the exam asks for.

Is API 1104 shown on screen during the API 1169 exam?

No. The exam is closed book, with the listed regulations shown as on-screen PDFs you cannot search. API 1104 and CSA Z662 are not among the on-screen documents, so procedure and welder qualification, defect types and repair rules have to be learned before test day. The federal welding rules in the listed parts of 49 CFR 192 and 195 are the ones you can read during the exam.